Water Treatment
Heading
Water Treatment
We’ve been involved in designing and manufacturing units for waste-water treatment for over 35 years and have worked on many high profile projects. Last year we worked alongside EPS Group on a new build wastewater facility in Mogeely Co. Cork.
The project involved the design, manufacture and installation of two units for the site in Mogeely, one unit to form a dosing building and a second larger unit to house the water treatment pumps (DAF Building).
We built the units to the clients specific requirements, including all of the provision for louvered vents and services opes for the clients equipment and services. With such a large project we worked closely with the main contractor to ensure our insulated units meet all requirements.
The entire unit was designed and manufactured at our facility in Kilbeggan. As each panel is prefabricated, we were able to install the unit in days.
By having such a quick install, we were able to minimise disruption to the rest of the project by allowing services to be installed immediately after installation of the unit.